Piles and foundation
Choose a language: БългарскиEnglish
Youtube
shadow shadow





CONTACT US

Telephone for contact:
Person for contactт:
Georgi Kolev
0897 848 494

Anastas Kolev
0897 84 84 54

E-mail: strmeh1@abv.bg
shadow

A slurry wall

Construction Machinery-1 Varna   carries out construction fortifying activity through a slurry wall.
It is called so, because a technological opening in a rectangular shape is excavated in the ground in compliance with the design requirements.
The so called leading curbs are preliminary prepared, which purpose is to direct the jaws of the drilling machine.
Reinforcement is put in the technological opening and then concrete is injected. After complete strength of the concrete, follows the execution of the excavation.
Very frequently the slurry walls are combined with anchors for additional steadiness of the steel-concrete wall by a lateral pressure of the earth layers.




shadow
2019, All rights reserved.

A slurry wall